SEVC Cascades
A strata building required a scalable and load-managed EV charging system that would allow equitable access for residents while ensuring the electrical infrastructure remained stable. The project successfully integrated an EV charging network with automated billing, ensuring user-pays functionality without overloading the existing power supply. The result was a future-proof system that allowed seamless expansion and efficient power distribution.

